JORDAN HYDROELECTRIC PLANT

INSTALLATION

>>HOME<

2 UNITS 4.5 MW

----UNDER CONSTRUCTION----

2- MODULAR KAPLAN TURBINE GENERATOR UNITS

US ARMY CORPS OF ENGINEERS' DAM

---JORDAN DAM INSTALLATION---

----PAGES----

 

1-24-2011

TOWER CONTROL BOOTH CANTILEVER SUPPORT

MOUNTED TO SOUTHEAST CORNER OF TOWER

 

MOUNTED TO SOUTHEAST CORNER OF TOWER

 

 

STEP-UP TRANSFORMER CONTAINMENT

DESIGNED TO CONTAIN TRANSFORMER OIL LEAK

 

2 - 6" WELL CASINGS 78 FEET LONG

 

 

 

USGS WATER LEVEL STILLING WELLS INSTALLED ON NORTHWEST TOWER WALL. REPLACES EXISTING WELL

1-31-2011

 

5 KV FEEDERS FROM GSU TO TOWER

PULL BOXES AT BRIDGE ABUTMENT

 

  

 

 

2-7-2011

 

WIRE CUTTING PARAPET WALL

 

 

 

TOWER ROOF CONCRETE CUTTING COMPLETE

 

LAUNCHING BARGES FOR TOWER INSPECTION DIVE

 

LAUNCHING BARGES FOR TOWER INSPECTION DIVE

BARGES IN PLACE FOR INSPECTION DIVE

 

2-28-2011

 

SETTING ELECTRICAL SWITCHGEAR INSIDE TOWER BOOTH

5 KV SWITCHGEAR INSIDE TOWER BOOTH

 

208/120 TOWER BREAKER PANEL

TRANSFER SWITCH

INSTALLING TOWER BOOTH MAIN CONDUIT FEEDERS

 

 

 

 

 

OLD USGS GAUGING STATION

NEW USGS GAUGING STATION

 

 

EMERGENCY GENERATOR PAD / UNDERGROUND FEEDER BANK RESEEDING