JORDAN HYDROELECTRIC PLANT INSTALLATION |
2 UNITS 4.5 MW |
----UNDER CONSTRUCTION----
2- MODULAR KAPLAN TURBINE GENERATOR UNITS
US ARMY CORPS OF ENGINEERS' DAM
---JORDAN DAM INSTALLATION---
----PAGES----
1-24-2011
TOWER CONTROL BOOTH CANTILEVER SUPPORT |
MOUNTED TO SOUTHEAST CORNER OF TOWER |
MOUNTED TO SOUTHEAST CORNER OF TOWER |
STEP-UP TRANSFORMER CONTAINMENT |
DESIGNED TO CONTAIN TRANSFORMER OIL LEAK |
2 - 6" WELL CASINGS 78 FEET LONG
|
|
USGS WATER LEVEL STILLING WELLS INSTALLED ON NORTHWEST TOWER WALL. REPLACES EXISTING WELL
1-31-2011
5 KV FEEDERS FROM GSU TO TOWER |
PULL BOXES AT BRIDGE ABUTMENT |
|
2-7-2011
WIRE CUTTING PARAPET WALL |
TOWER ROOF CONCRETE CUTTING COMPLETE |
LAUNCHING BARGES FOR TOWER INSPECTION DIVE |
LAUNCHING BARGES FOR TOWER INSPECTION DIVE |
BARGES IN PLACE FOR INSPECTION DIVE
2-28-2011
SETTING ELECTRICAL SWITCHGEAR INSIDE TOWER BOOTH |
5 KV SWITCHGEAR INSIDE TOWER BOOTH |
208/120 TOWER BREAKER PANEL |
TRANSFER SWITCH |
INSTALLING TOWER BOOTH MAIN CONDUIT FEEDERS |
|
OLD USGS GAUGING STATION |
NEW USGS GAUGING STATION |
EMERGENCY GENERATOR PAD / UNDERGROUND FEEDER BANK RESEEDING
|