JORDAN HYDROELECTRIC PLANT UNDERWATER CONCRETE CUTTING |
2 UNITS 4.5 MW |
----UNDER CONSTRUCTION----
2- MODULAR KAPLAN TURBINE GENERATOR UNITS
US ARMY CORPS OF ENGINEERS' DAM
---JORDAN DAM INSTALLATION---
WIRE SAWING AND REMOVAL OF THREE FEET THICK CONCRETE SLABS 20 FEET UNDERWATER
6 SECTIONS / 3' X 4' X 11.5' 22,000 POUNDS EACH
Week of 3-21-2011 / 3-28-2011
DIAMOND WIRE SAW BARGE SETUP |
BLUEGRASS COMPANIES |
GRAINGER UNDERWATER SERVICES |
BARGE SETUP FOR SAWING OPERATIONS |
TRANSFORMER CONTAINMENTS STEEL SHIELD WALL
|
RANDY CARNES / BILL CARNES / JASON KARKIEWICZ GRAINGER UNDERWATER SERVICES / BC WELDING |
|
TOWER CONTROL BOOTH CONDUIT ACCESS PLATFORM |
35-TON ROUGH TERRAIN CRANE SETUP ON TOWER ROOF |
50,000# 2 1/2" SWIVEL HOIST RING FOR SIDE CONCRETE SLABS |
DIVERS THREADING CUTTING WIRE |
EAST SIDE, CENTER SLAB CUTTING. 15 FEET DEEP |
|
PAUL CHIEBOWSKI / 22,000# CENTER CONCRETE BLOCK |
4+ FEET WIDE X 3 FEET THICK X 11 FEET LONG - 22,000# |
MLULL 10K EXTENDED BOOM FORKLIFT / PINTLE HITCH ATTACHMENT |
60,000# OFF ROAD RATED EQUIPMENT TRAILER |
2 BLOCKS - 42,000# |
4-PART RIGGING FOR CENTER BLOCKS |