|
JORDAN HYDROELECTRIC PLANT SITE DIVE SURVEY |
| 2 UNITS 4.5 MW |
----UNDER CONSTRUCTION----
2- MODULAR KAPLAN TURBINE GENERATOR UNITS
US ARMY CORPS OF ENGINEERS' DAM
---JORDAN CONSTRUCTION PAGES---
----PAGES----
|
DIVING SURVEY AT TOWER |
LAUNCHING BARGES |
|
GRAINGER UNDERWATER SERVICES (GUS) / NORTH FORK ELECTRIC INC. (NFEI) |
|
LAUNCHING BARGES |
LOADING EQUIPMENT |
|
POSITIONING BARGE AT TOWER FACE |
INSTALLING CAPTURE BUMPERS |
|
SIDE CAPTURE BUMPERS |
UPSTREAM CAPTURE BUMPERS |
|
DIVERS STATION |
DIVER PREPARATION |
|
PAUL CHLEBOWSKI / DIVE MASTER, GUS |
DIVER STAGING |
|
MEASUREMENT JIG PLACEMENT |
HOT WATER DIVE |