DUKE POWER MARSHALL HYDROELECTRIC PLANT
2 UNITS

5 MW 45 FOOT WIDE X 45 FOOT DEEP INTAKE

>>HOME<<

NFEI installed a 45 foot wide Dragrake at Carolina Power and Light's Marshall hydroelectric plant in western North Carolina. This site has two 2500 KW units with a single trashrack intake. The site had a twin boom ©Atlas Polartrash rake but due to the heavy volume of trash and extreme silt loads this rake could not keep up - requiring extensive labor overtime and periodic dredging.

Since our installation of the Dragrake CP&L has found the intake and forebay clear of all debris and silt to the bottom and the Dragrake's fully automatic operation has greatly eliminated overtime!

2015 UPGRADES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ATLAS POLAR REMOVAL

COMPLETED DRAGRAKE INSTALLATION

 

SLUICING TROUGH

FRAMEWORK SUPERSTRUCTURE

RAKING BEAM

REAR VIEW

INSIDE CONTROL PANEL

OPERATOR CONTROLS

CYCLE COUNTER / FAULT DISPLAY