SOUTH CAROLINA ELECTRIC
AND GAS
PARR HYDROELECTRIC PLANT |
|
6 - 25 FEET WIDE DRAGRAKES, ELEVATED PLATFORMS, AND HEADGATE HOIST
|
STARTUP OF UNIT 5 AND 6 RAKES 4 HOURS OF RAKING 2-3 FEET OF DEPTH - 20+ TO GO. ACCUMULATED DEBRIS BURIED IN SILT OVER THE PAST 90 YEARS A LOT MORE TO COME! |
WATER LOGGED TIMBER
SLUICING TROUGH IN ACTION
1ST 30 CUBIC YARD DUMPSTER LOAD COLLECTED
SECOND DUMPSTER LOAD COLLECTED / MUCH MORE TO COME
TRASH COLLECTED IN APPROXIMATELY 150 RAKE CYCLES PER RAKE
INSTALLATION PICTURES BELOW
CRANE AND ANCHOR DRILLING BARGE |
EQUIPMENT LOADING |
EQUIPMENT LOADING |
ELEVATED PLATFORM INSTALLATION |
ELEVATED PLATFORM INSTALLATION |
NEW SPECIALLY DESIGNED HEADGATE HOIST |
CONTROL BOOTH PLATFORM |
CONTROL BOOTH PLATFORM |
CONTROL BOOTH PLATFORM |
FILLER JOISTS |
RAKE FRAMES |
SKID PLATE AND TROUGH INSTALLATION |
BARGE LOADING FOR ANCHOR DRILLING |
40' LOADING RAMPS |
M10K LULL |
LOADING BARGE |
THE WATER HOG |
|
KLEMM DRILL RIG |
|
|
|
WEEK 5
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WEEK 6
|
|
|
|
|
|
|
|
|
WEEK 7
|
|
|
|
|