SOUTH CAROLINA ELECTRIC AND GAS 

PARR HYDROELECTRIC PLANT

6 UNITS

15 MW

>>HOME<

 

6 - 25 FEET WIDE DRAGRAKES, ELEVATED PLATFORMS, AND HEADGATE HOIST

STARTUP OF UNIT 5 AND 6 RAKES

4 HOURS OF RAKING 2-3 FEET OF DEPTH - 20+ TO GO.

ACCUMULATED DEBRIS BURIED IN SILT OVER THE PAST 90 YEARS

A LOT MORE TO COME!

 

 

WATER LOGGED TIMBER 

SLUICING TROUGH IN ACTION

1ST 30 CUBIC YARD DUMPSTER LOAD COLLECTED

 

SECOND DUMPSTER LOAD COLLECTED / MUCH MORE TO COME

TRASH COLLECTED IN APPROXIMATELY 150 RAKE CYCLES PER RAKE

 

 

INSTALLATION PICTURES BELOW

CRANE AND ANCHOR DRILLING BARGE

 

EQUIPMENT LOADING

EQUIPMENT LOADING

ELEVATED PLATFORM INSTALLATION

 

ELEVATED PLATFORM INSTALLATION

NEW SPECIALLY DESIGNED HEADGATE HOIST

 

CONTROL BOOTH PLATFORM

 

CONTROL BOOTH PLATFORM

 

CONTROL BOOTH PLATFORM

 

FILLER JOISTS

RAKE FRAMES

 

SKID PLATE AND TROUGH INSTALLATION

 

BARGE LOADING FOR ANCHOR DRILLING

 

40' LOADING RAMPS

 

M10K LULL

 

LOADING BARGE

 

THE WATER HOG

 

 

 

KLEMM DRILL RIG

 

 

 

 

 

 

WEEK 5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WEEK 6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WEEK 7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THE BIRTHPLACE OF COMMERCIAL NUCLEAR POWER

STEVENS CREEK

This website and the names, "North Fork Electric", "NFEI" and "Dragrake" are
©2006,
North Fork Electric, Inc