JORDAN HYDROELECTRIC PLANT

MODULE 2 (WEST SIDE) INSTALLATION 

 

>>HOME<

2 UNITS 4.5 MW

----UNDER CONSTRUCTION----

2- MODULAR KAPLAN TURBINE GENERATOR UNITS

US ARMY CORPS OF ENGINEERS' DAM

---JORDAN DAM INSTALLATION---

Module 2 West bay

 

TURBINE SECTION PRE-ASSEMBLY

 

 

LIFT CYLINDER

 

LIFT CARRIAGE

 

LOWER HEADGATE SECTION

 

 

 

TRANSPORT LOWER HEADGATE TO TOWER ROOF

 

 

LOWER HEADGATE SECTION IN WEST SLOT

SPILLGATES

 

RESTRICTOR PLATE

RESTRICTOR PLATE REVERSE VIEW

 

 

 

UPPER HEADGATE ASSEMBLY

 

J SEAL INSTALL

TRANSPORT DOWNSTREAM FLUME WALL

 

 

LIFT CARRIAGE ADJUSTMENT

CARRIAGE SIDE ROLLER AND DS SLIDE BLOCK

 

CARRIAGE LIFT CAMS / MODULE LIFT BLOCKS

DS FLUME WALL

 

 

 

TRANSPORT SHARKCAGE

 

 

 

RUNNER / DISCHARGE RING

NEW WICKETGATE OPERATING CYLINDER

 

TRANSPORT TURBINE

TESTING OPERATING CYLINDER

 

 

MODULE NOTCHING

TRANSPORT FLUME

 

RIGGING FLUME

LOWER BEARING SPIDER

 

SETTING FLUME

INSTALLING INSIDE BOLTS

 

ROPE ACCESS / INSTALLING OUTSIDE FLUME BOLTS

UPPER BEARING SPIDER

 

GREASE BEARING FLOOR

 

 

GENERATOR BOOTH

 

 

 

 

 

LOWER PLATFORM TRASHRACK

 

 

ACCESS BRIDGE

 

 

TRANSPORT GENERATOR

 

GENERATOR RIGGING

 

 

TEMPORARY INLET TIMBERS