JORDAN HYDROELECTRIC PLANT MODULE 2 (WEST SIDE) INSTALLATION |
2 UNITS 4.5 MW |
----UNDER CONSTRUCTION----
2- MODULAR KAPLAN TURBINE GENERATOR UNITS
US ARMY CORPS OF ENGINEERS' DAM
---JORDAN DAM INSTALLATION---
Module 2 West bay
TURBINE SECTION PRE-ASSEMBLY |
|
LIFT CYLINDER |
LIFT CARRIAGE |
LOWER HEADGATE SECTION |
|
TRANSPORT LOWER HEADGATE TO TOWER ROOF |
|
LOWER HEADGATE SECTION IN WEST SLOT |
SPILLGATES |
RESTRICTOR PLATE |
RESTRICTOR PLATE REVERSE VIEW |
|
|
UPPER HEADGATE ASSEMBLY |
J SEAL INSTALL |
TRANSPORT DOWNSTREAM FLUME WALL |
|
LIFT CARRIAGE ADJUSTMENT |
CARRIAGE SIDE ROLLER AND DS SLIDE BLOCK |
CARRIAGE LIFT CAMS / MODULE LIFT BLOCKS |
DS FLUME WALL |
|
|
|
TRANSPORT SHARKCAGE |
|
RUNNER / DISCHARGE RING |
NEW WICKETGATE OPERATING CYLINDER |
TRANSPORT TURBINE |
TESTING OPERATING CYLINDER |
|
MODULE NOTCHING |
TRANSPORT FLUME |
RIGGING FLUME |
LOWER BEARING SPIDER |
SETTING FLUME |
INSTALLING INSIDE BOLTS |
ROPE ACCESS / INSTALLING OUTSIDE FLUME BOLTS |
UPPER BEARING SPIDER |
GREASE BEARING FLOOR |
|
GENERATOR BOOTH |
|
|
|
LOWER PLATFORM TRASHRACK |
|
|
ACCESS BRIDGE |
|
|
TRANSPORT GENERATOR |
GENERATOR RIGGING |
|
|
TEMPORARY INLET TIMBERS |
|
|