JORDAN HYDROELECTRIC PLANT INSTALLATION WORK WEEKS OF 9-19 / 10-3, 2011 |
2 UNITS 4.5 MW |
----UNDER CONSTRUCTION----
2- MODULAR KAPLAN TURBINE GENERATOR UNITS
US ARMY CORPS OF ENGINEERS' DAM
---JORDAN DAM INSTALLATION---
Module 1 East bay slot installation
Kaplan turbine runner |
Runner hub |
Runner inside discharge ring |
Shark cage loaded on equipment trailer |
|
Transport to tower roof |
Shark cage upstream, sides and bottom |
28,000 pounds |
|
|
Turbine components transported to tower |
Distributor with wicket gates |
Runner shaft coupling with hydraulic ports |
|
Underside of headgate section showing bottom rubber seal |
East front water quality gate opening |
Downstream face of module interface with stoplog slot - viewed from boat |
|
Lift carriage viewed from boat
|
Looking up drafttube from boat |
Carriage |
|
|
|
Runner blade angle LVDT sensor |
Wicket gate operator shaft |
Installing runner nosecone |
Runner support jig |
Lower turbine section assembly |
|
|
Rope access / fall protection