JORDAN HYDROELECTRIC PLANT

INSTALLATION WORK WEEK OF 8-8-11

 

>>HOME<

2 UNITS 4.5 MW

----UNDER CONSTRUCTION----

2- MODULAR KAPLAN TURBINE GENERATOR UNITS

US ARMY CORPS OF ENGINEERS' DAM

---JORDAN DAM INSTALLATION---

Module 1 Lift Carriage Installation

Week of 8-8-11

* Note

Carriage is being installed partially plated and not galvanized to test the fit and performance. 

After acceptable operation is proven by installing the east side module, the carriage will be removed, completed and galvanized

Downstream side of carriage

Downstream slide block and side roller

 

Upstream shim blocks west side of east bay

Upstream shim blocks east side of east bay

 

 

Upstream shim blocks and downstream slot plates

Downstream water quality slot plates for Carriage 

 

 

Carriage slide blocks bearing on plates

 

 

 

 

   

       

Lifting cams

 

Carriage in slot supported by E-beam mounted hoist rings and slings