JORDAN HYDROELECTRIC PLANT GSU INSTALLATION / TRASHRACKS / LOWER PLATFORM |
2 UNITS 4.5 MW |
----UNDER CONSTRUCTION----
2- MODULAR KAPLAN TURBINE GENERATOR UNITS
US ARMY CORPS OF ENGINEERS' DAM
---JORDAN DAM INSTALLATION---
Module 1 Headgate install
Weeks of 7-11-2011 / 7-18-2011
Transport to tower roof |
|
EQUIPMENT TRAILER AND 10K MLULL |
|
|
|
COMPLETION OF PLATFORMS AND RAILINGS |
INSTALLATION OF DOWNSTREAM SLOT PLATES |
LOWER HEADGATE LIFT ON TOWER ROOF |
|
|
OUTSIDE COLUMN ENDPLATE MODIFICATION TO FIT SLOT GUIDE CHANNELS |
EAST SIDE FIT TEST |
INSTALLATION OF UPPER HEADGATE SECTION ON EAST SIDE |
|
DRAFTUBE COVER PLATE FOR UPCOMING SEAL TEST
|
COMPLETE HEADGATE DOGGED OFF IN WEST BAY |
|
|