JORDAN HYDROELECTRIC PLANT INSTALLATION WORK WEEKS OF 12-5-11 THROUGH 1-2-12 |
2 UNITS 4.5 MW |
----UNDER CONSTRUCTION----
2- MODULAR KAPLAN TURBINE GENERATOR UNITS
US ARMY CORPS OF ENGINEERS' DAM
---JORDAN DAM INSTALLATION---
Module 1 East bay Module start-up
TURBINE GUIDE BEARING INSTALLATION |
RUBBER GUIDE BEARING |
|
ALIGNMENT OF SHAFTS |
GENERATOR ELEVATION JACKS |
MODULE LIFT SYSTEM REMOTE CONTROL |
SPLIT GREASE BEARING INSTALLATION |
WATER GUIDE BEARINGS AND FLUME SECTION VIEWED FROM TURBINE |
UPPER 4-BLOCK GUIDE BEARING |
TEMP, LEVEL AND PRESSURE MONITORS INSIDE GSU |
SCADA CONTROL |
23 KV HIGH VOLTAGE SIDE OF GSU |
5 KV LOW VOLTAGE SIDE OF GSU |