JORDAN HYDROELECTRIC PLANT

INSTALLATION WORK WEEKS OF 12-5-11 THROUGH 1-2-12

 

>>HOME<

2 UNITS 4.5 MW

----UNDER CONSTRUCTION----

2- MODULAR KAPLAN TURBINE GENERATOR UNITS

US ARMY CORPS OF ENGINEERS' DAM

---JORDAN DAM INSTALLATION---

Module 1 East bay Module start-up

TURBINE GUIDE BEARING INSTALLATION

RUBBER GUIDE BEARING

 

 

 

ALIGNMENT OF SHAFTS

 

GENERATOR ELEVATION JACKS

MODULE LIFT SYSTEM REMOTE CONTROL

 

 

SPLIT GREASE BEARING INSTALLATION

 

WATER GUIDE BEARINGS AND FLUME SECTION VIEWED FROM TURBINE

UPPER 4-BLOCK GUIDE BEARING

 

TEMP, LEVEL AND PRESSURE MONITORS INSIDE GSU

SCADA CONTROL

 

23 KV HIGH VOLTAGE SIDE OF GSU

5 KV LOW VOLTAGE SIDE OF GSU