JORDAN HYDROELECTRIC PLANT

INSTALLATION WORK WEEKS OF 11-7 / 11-14 2011

 

>>HOME<

2 UNITS 4.5 MW

----UNDER CONSTRUCTION----

2- MODULAR KAPLAN TURBINE GENERATOR UNITS

US ARMY CORPS OF ENGINEERS' DAM

---JORDAN DAM INSTALLATION---

Module 1 East bay slot installation

UMBILICAL CABLES

5 KV UMBILICAL / LIFT CARRIAGE / ROLL-UP DOOR

 

LOADING GENERATOR ON EQUIPMENT TRAILER

 

GENERATOR 57,000 POUNDS

 

ROOF REMOVED / GENERATOR SET

UMBILICAL PASSING THROUGH UPPER PLATFORM

 

UPPER PLATFORM UMBILICAL CLEARANCE