JORDAN HYDROELECTRIC PLANT INSTALLATION WORK WEEKS OF 10-17 / 10-24, 2011 |
2 UNITS 4.5 MW |
----UNDER CONSTRUCTION----
2- MODULAR KAPLAN TURBINE GENERATOR UNITS
US ARMY CORPS OF ENGINEERS' DAM
---JORDAN DAM INSTALLATION---
Module 1 East bay slot installation
Rope access for installing bolts in Flume Section |
|
|
|
|
Bearing spiders |
Graphite impregnated phenolic 4-block water bearings |
Welding receptacle |
Intake Section |
WEEK OF 10-24-11
Booth disassembly / Generator loading in Crumpler |
|
|
|
Upending flume section on tower roof |
|
Grease bearing floor |
Generator floor / booth transport to tower roof |
Generator floor / booth installed on Module |
Flume Section side view above Turbine Section
|